What happens to the buyer’s money while the building is under construction: a country-by-country comparison
In four of the countries covered by the portal, the law requires payments for an off-plan apartment to be protected: escrow in Dubai and Abu Dhabi, insurance or a bank guarantee in Spain, a bank guarantee in Vietnam, and security in Turkey for projects of 30 or more apartments. In Cyprus, Georgia and Bulgaria the buyer is protected by registration, the contract and the payment schedule; in Thailand, by standard-form contracts and by escrow if the parties agree to it.
Contents
What protects the buyer’s money during construction
Four mechanisms protect the payments made by someone buying an apartment in a building under construction. An escrow account keeps the money separate from the developer and releases it as work progresses (in the UAE) or once the contract has been performed (in Thailand). A bank guarantee or insurance refunds what has been paid if the building is not completed. Limits on stage payments reduce the amount at risk. Registering the contract or the right secures the apartment itself for the buyer.
- Escrow account. The money goes into a separate project account rather than directly to the developer. It protects the money itself.
- Bank guarantee or insurance of advance payments. The guarantor refunds what has been paid if the building is not built or not completed on time.
- Stage payments. The law or the contract limits how much the developer receives before a given stage.
- Registration. The apartment cannot be sold a second time or mortgaged. It protects the right to the apartment, not the money.
Which mechanism applies in each country
The law makes protection of the buyer’s money mandatory in Dubai and Abu Dhabi, Spain, Vietnam and Turkey; in Turkey, only for projects of 30 or more apartments. In Cyprus, Georgia and Bulgaria the buyer is protected by registration of the contract or the right, by a contract that follows rules set by law and by a schedule of stage payments. In Thailand, protection comes from mandatory standard-form contracts and from escrow if the parties agree to it.
| Country | Mechanism under the law | Mandatory? | What it covers |
|---|---|---|---|
| Cyprus | depositing the sales contract with the Department of Lands and Surveys; Form A if the property is mortgaged | no; the contract is deposited within 6 months | the right to the apartment, release of the bank’s mortgage once paid; not a refund |
| UAE, Dubai | project escrow account, registration of the contract in Oqood (the register of off-plan contracts) | yes, Law No. 8 of 2007 | all payments; released to the developer as work progresses |
| UAE, Abu Dhabi | project escrow account, registration in the register | yes, Law No. 3 of 2015 | all payments; until 20% of the work is done, releases only against a bank guarantee |
| Georgia | registration of an apartment in a building under construction or preliminary registration of the right | no; by agreement between the parties | bars a second sale or a mortgage; not a refund |
| Bulgaria | preliminary contract, right to build (a right to the future apartment), then the apartment itself | no | the right to obtain the final contract through the courts; not a refund |
| Spain | insurance or bank guarantee, special construction account | yes, from the building permit | all advance payments, including taxes, plus statutory interest |
| Vietnam | bank guarantee, payment limits | yes; the buyer may waive the guarantee in writing | refund of what has been paid if the apartment is not handed over on time; no more than 70% of the price before handover |
| Thailand | escrow, standard-form sale and reservation contracts | escrow by agreement between the parties; the standard forms are mandatory | with escrow, all payments until the contract is performed; for reservations, the grounds set out in the form |
| Turkey | completion insurance, bank guarantee or payment as work progresses | yes, in projects of 30 or more apartments | if the seller goes bankrupt, the money does not go to its creditors; withdrawal with a deduction of up to 8% plus the registration fee |
The table does not rate how reliable the countries are: it shows what the law provides. Laws checked on 10–19 November 2026.
Cyprus: depositing the contract and releasing the bank’s mortgage
In Cyprus the buyer’s right is secured by depositing the contract under the Sale of Property (Specific Performance) Law 81(I)/2011: the contract is lodged with the Department of Lands and Surveys within 6 months of signing, for a fee of €50. After that, no other contract for the same apartment will be accepted, and the buyer can ask a court to order the transfer of the apartment into their name.
Since 12 December 2023 the seller has had to attach a search certificate for the property to the contract, and a contract for a property mortgaged to a bank is deposited together with Form A: the bank and the seller state the amount and the account, and once that amount has been paid the bank must release the mortgage on the buyer’s apartment. Without the form, the contract is accepted only with the buyer’s written consent. The buyer’s steps: read the certificate, pay only into the account stated in Form A if the property is mortgaged, and make sure the contract is deposited on time.
UAE: escrow accounts in Dubai and Abu Dhabi
In Dubai (Law No. 8 of 2007) and Abu Dhabi (Law No. 3 of 2015), a developer selling off-plan apartments opens an escrow account for each project, and buyers’ payments go into it. The account serves that project only, and the developer’s creditors cannot attach it. Until the building is 20% complete, money can be released to the developer only against a bank guarantee (in Dubai this is a condition of the Dubai Land Department service); after that, in line with the percentage of work completed.
If a project in Dubai is cancelled, the law requires buyers’ payments to be refunded: from the escrow account within 14 days, while the developer must repay any shortfall within 60 days unless Dubai’s Real Estate Regulatory Agency (RERA) extends the deadline. The buyer’s steps: make sure the contract is entered in the register (in Dubai, Oqood; without registration the sale is void) and pay only into the project’s escrow account.
Georgia: registering the apartment with the Public Registry
In Georgia the buyer’s right is secured through the Public Registry. An apartment in a building under construction can be registered in the buyer’s name before completion if the building is entered in the register as under construction; alternatively, by agreement between the parties, the right can be preliminarily registered, which prevents the apartment from being sold a second time or mortgaged. Registration costs ≈ $58 and takes 4 working days.
According to an IMF report (June 2026), developer payment plans are outside the National Bank’s supervision: developers are not treated as financial intermediaries, and the terms of the instalments are set by the contract. The buyer’s steps: register the right before making large payments and tie the instalments to construction stages.
Bulgaria: preliminary contract and right to build
In Bulgaria protection rests on the stages of the transaction, while the builder’s mandatory liability insurance covers damage caused during construction, not the buyer’s advance payments.
The preliminary contract is made in writing, and either party can ask a court to order the conclusion of the final contract. Until the building has reached the rough construction stage (‘grub stroezh’), the buyer can only be given a right to build, that is, a right to a future apartment in a building still under construction; after that stage, the apartment itself. The building may be used once the permit for use has been issued (Act 16). The buyer’s step: tie payments to these documents, because the law does not prescribe a schedule.
Spain: every advance payment covered by insurance or a bank guarantee
The Building Act (Ley 38/1999) requires the developer of any housing, from the moment the building permit is granted, to secure the refund of advance payments with insurance or a bank guarantee under which the bank is jointly and severally liable with the developer. The cover extends to all amounts paid, including taxes, plus statutory interest. Advance payments may be accepted only through a bank, into a special account kept separate from the developer’s other funds.
The guarantee is triggered if construction has not started or has not been completed on time, or if the building has not obtained its occupancy permit; if the developer fails to refund the money within 30 days of a formal demand, the guarantor pays. The buyer’s step: before each payment, obtain the guarantee document for that amount and pay only into the special account.
Vietnam: bank guarantee and payment limits
The 2023 Law on Real Estate Business, in force since 1 August 2024, requires a developer to obtain a guarantee from a commercial bank before sales begin: if the apartment is not handed over on time, the bank refunds what has been paid. Sales open after the foundations have been accepted and the provincial authority has replied in writing, and payments are made only through a bank in Vietnam.
Payment limits: a deposit of no more than 5% of the price, a first payment (deposit included) of no more than 30%, no more than 70% before the apartment is handed over (50% for a foreign-invested developer) and no more than 95% before the title deed is issued. The rules are given as of 19 November 2026: Vietnam’s National Assembly is considering new versions of the Law on Housing and the Law on Real Estate Business, with a vote scheduled for the end of the session in November 2026. Under the draft reported by VietnamFinance, the 30% and 70% limits would move from the law into a government decree.
The buyer may waive the guarantee in writing. The developer hands over the bank’s guarantee letter within 10 working days of the contract being signed, or within another period set by the contract, and only then accepts payments under the contract. The buyer’s steps: do not sign a waiver, and obtain the letter before the first payment under the sale and purchase agreement.
Thailand: voluntary escrow and standard-form contracts
The Escrow Act has been in force since May 2008, and its use is voluntary: neither it nor the Condominium Act requires a developer to sell off-plan apartments through escrow. If the parties agree to it, the money is held by a licensed financial institution supervised by the Ministry of Finance, and the Department of Lands does not register the transfer of title without notice from the escrow agent.
Without escrow, mandatory standard forms apply. The sale contract must follow the form prescribed by the minister; terms outside it that are unfavourable to the buyer have no effect, and advertising counts as part of the contract. Since 2025 the reservation agreement has also followed a standard form: the developer may not charge a fee for assigning it, and if the developer has not obtained a building permit or has changed the project without the buyer’s consent, the buyer may cancel the reservation and the money is refunded within 15 days (45 days if paid by card). The buyer’s steps: propose escrow, check the contract against the standard form and keep the project’s advertising.
Turkey: security for projects of 30 or more apartments
Consumer Protection Law No. 6502 allows the contract to be concluded only after a building permit has been issued, in notarised form or with registration at the land registry, and prohibits any payment before it, including for a reservation. In projects of 30 or more apartments, the seller must put in place, before sales begin, completion insurance, a bank guarantee, release of funds as work progresses (hakediş) or another form of security from the list in the law; if the seller goes bankrupt, this money does not go to its creditors.
The apartment must be handed over within 48 months. In the first 14 days the buyer can withdraw without penalty, and within 24 months can terminate the contract by paying the registration fee and similar mandatory costs plus compensation to the seller: on a $200,000 apartment, up to $4,000 (2%) in the first 3 months, $8,000 (4%) from the 3rd to the 6th month, $12,000 (6%) from the 6th to the 12th and $16,000 (8%) from the 12th to the 24th month. If it is the seller who fails to perform, nothing is deducted; the money is refunded within 180 days at the latest.
A caveat: the law protects consumers, and whether a court treats someone who buys several apartments to let as a consumer depends on the circumstances. The buyer’s step: find the type of security in the contract.
How much of the price goes to the developer before completion
Only Vietnam sets by law the share of the price that the developer receives before completion: no more than 70%, or 50% for a foreign-invested developer. In the other countries it is set by typical payment structures, developers’ schedules and the contract. What matters more to the buyer is how that amount is secured: by an escrow account, a guarantee or the contract alone.
- A new apartment bought from a developer for 200,000 in the settlement currency: euros in Cyprus and Spain, US dollars in the UAE, Vietnam, Thailand and Turkey.
- VAT is not included in the shares; in Cyprus and Spain it is added to each instalment.
| Country | Payments before completion, share of price | On a 200,000 apartment | How the amount is secured |
|---|---|---|---|
| Cyprus | 80–90%, typical structure according to INDEX.cy | €160,000–180,000 plus VAT | deposited contract: right to the apartment |
| UAE, Dubai | 5–20% under special schedules of individual projects, Q3 2026 (Savills) | $10,000–40,000 | project escrow account |
| Georgia | per contract | set by the contract | registration with the Public Registry |
| Bulgaria | per contract | set by the contract | preliminary contract and right to build |
| Spain | 20–30% before the notarial deed, the remaining 70–80% on signing the deed (AEDAS Homes, Aelca) | €40,000–60,000 plus IVA (Spanish VAT) | guarantee covering the full amount with IVA and interest |
| Vietnam | no more than 70%, 50% with foreign capital (law) | up to $140,000; up to $100,000 | bank guarantee, unless the buyer has waived it |
| Thailand | 25–30% before completion at Sansiri (the developer’s guide for foreign buyers; some projects differ) | $50,000–60,000 | escrow by agreement between the parties; standard-form contract |
| Turkey | down payment of 20–50%, balance over 12–60 months (Tekce, Emlak Platform) | down payment of $40,000–100,000 | security in projects of 30 or more apartments |
The rows rely on different sources: the law, a review by the INDEX.cy portal, developers’ schedules and special offers, and brokers’ reviews. They are not market averages or a direct comparison between countries. Where the table says ‘per contract’, the shares are set by the contract.
The Cypriot 80–90% is the full price minus the payment on completion (10–20%) under the typical structure described in the INDEX.cy review (June 2026). In Dubai, 5–20% reflects special schedules of individual projects; according to a forecast by one broker, Metropolitan Premium Properties, in Khaleej Times (January 2026), 70/30 and 80/20 schedules will become the 2026 standard among large developers, which means $140,000–160,000 before completion. Payment schedules by country are covered in detail in the article on mortgages and payment plans.
In Turkey the down payment is 20–50%, with the balance paid monthly over 12–60 months, usually interest-free (reviews by the brokers Tekce and Emlak Platform); on a $200,000 apartment the down payment is $40,000–100,000. The instalment period can be longer than construction, so the share paid before completion is set by the contract.
What to check before the first payment
Before the first payment, it is worth establishing three things: which protection mechanism applies in the country and in the specific project, which account the money goes to, and what confirms the buyer’s right to the apartment. The answers are in the documents the developer provides before the contract is signed; they are worth obtaining before signing, not after the first instalment.
- Account: in the UAE, the project escrow account; in Spain, the special construction account; in Vietnam, an account with a bank in the country; in Cyprus, if the property is mortgaged, the account stated in Form A.
- Guarantee: in Spain, a document for each advance payment; in Vietnam, the guarantee letter before the first payment under the contract; in Turkey, the type of security stated in the contract.
- Register: Oqood in Dubai, the transaction register in Abu Dhabi, deposit of the contract in Cyprus, registration of the right in Georgia.
- Schedule: in Cyprus, Bulgaria, Georgia and Thailand, instalments are best tied to documents confirming construction stages rather than to dates.
Taxes and fees on top of these instalments are covered in the article on the costs of buying an apartment.
What this means
The countries differ in what the mechanism protects: the money itself or the right to the apartment. Everywhere, protection works only if the buyer takes their own step: pays into the right account, obtains the guarantee document before paying, or registers the contract before making large instalments.
- A mandatory mechanism works when the buyer takes the right step: in Vietnam, signing a waiver switches the guarantee off; in Turkey, protection is designed for consumers and for projects of 30 or more apartments; in Dubai, a sale not registered in Oqood is void.
- Only a schedule of stage payments reduces the amount at risk: registration secures the right to the apartment, not the money. Where there is no escrow or guarantee, instalments are best tied to confirmed construction stages.
- Rules change: in Vietnam, the payment limits may change after the vote on the new version of the law; in Georgia, according to the IMF report, the National Bank has temporarily eased capital requirements for developers taking bank loans, while developer payment plans are outside its supervision. Terms are worth checking as of the transaction date.
Questions and answers
In which countries does money for an off-plan apartment go into an escrow account?
By law, an escrow account is mandatory in Dubai (Law No. 8 of 2007) and Abu Dhabi (Law No. 3 of 2015). Buyers’ payments go into a separate project account that the developer’s creditors cannot attach, and the developer receives the money as work progresses. If a project in Dubai is cancelled, the law requires buyers’ payments to be refunded.
What does the guarantee on advance payments cover when you buy a new-build home in Spain?
The Building Act requires the developer, from the moment the building permit is granted, to secure the refund of every advance payment with insurance or a bank guarantee. The cover extends to all amounts paid, including taxes, plus statutory interest. The guarantee is triggered if construction has not started or has not been completed on time, or if the building has not obtained its occupancy permit. Advance payments may be accepted only into the special construction account.
How much can you pay a developer in Vietnam before the apartment is handed over?
The 2023 Law on Real Estate Business limits the deposit to 5% of the price, the first payment including the deposit to 30%, and all payments before handover to 70%, or 50% for a foreign-invested developer. Until the title deed is issued, the developer receives no more than 95%. Payments are covered by a bank guarantee unless the buyer has waived it in writing. The rules are given as of 19 November 2026.
How is your money protected when you buy an apartment in a building under construction in Georgia?
Protection comes from the Public Registry: an apartment in a building under construction can be registered in the buyer’s name before completion if the building is entered in the register as under construction; alternatively, by agreement between the parties, the right can be preliminarily registered, which prevents the apartment from being sold a second time or mortgaged. Registration costs ≈ $58. It secures the right to the apartment, while the amount at risk is reduced by a schedule of stage payments written into the contract.
Is escrow mandatory when you buy an off-plan apartment in Thailand?
No. The Escrow Act has been in force since May 2008, but an escrow agent is appointed only by agreement between the parties. Without escrow, the buyer is protected by the mandatory standard forms of the sale contract and the reservation agreement: terms outside the form that are unfavourable to the buyer have no effect, advertising counts as part of the contract, and if the developer has not obtained a building permit or has changed the project without consent, the buyer may cancel the reservation and get the money back within 15 days (45 days if paid by card).
Can you withdraw from a contract for an off-plan apartment in Turkey, and how much is deducted?
Yes. In the first 14 days a buyer who is a consumer can withdraw without giving reasons and without penalty, and within 24 months of the contract date may terminate it by paying the seller compensation of 2% to 8% of the price, depending on timing, plus the registration fee and similar mandatory costs. If the seller itself fails to perform the contract, nothing is deducted. The money is refunded within 180 days at the latest.
Sources and calculations
Example: a new apartment bought from a developer for 200,000 in the country’s settlement currency (euros in Cyprus, Bulgaria and Spain; US dollars in the UAE, Georgia, Vietnam, Thailand and Turkey); the buyer is a private investor, not resident in the country, buying without a mortgage. Euros are not converted into dollars, countries are compared as a percentage of the price, and VAT is not included in the payment shares. The protection mechanisms are taken from the countries’ laws, checked on 10–19 November 2026. The shares of the price paid before completion come from Vietnamese law, an INDEX.cy review (June 2026), a Savills report for Q3 2026, a forecast by the broker Metropolitan Premium Properties in Khaleej Times (January 2026), payment schedules of the developers AEDAS Homes, Aelca and Sansiri, and reviews by the brokers Tekce and Emlak Platform; except for Vietnam, they reflect market practice, not legal requirements. The Georgian Public Registry fee is converted into dollars at the National Bank of Georgia rate of 2.5943 lari per dollar on 10 November 2026. Firstowner’s calculation based on these data.
List of sources: 34
- CyLaw: Ν. 81(I)/2011, консолидированный текстchecked 10 Nov 2026
- Purchase of Immovable Property: The importance of Depositing the Sale Contract at the Department of Lands and Surveys (DLS leaflet)checked 10 Nov 2026
- Off-Plan Property in Cyprus: The Complete 2026 Buyer's Guide, INDEX.cychecked 18 Nov 2026
- Law No. (8) of 2007 Concerning Escrow Accounts for Real Estate Development in the Emirate of Dubai (PDF, Dubai Legislation Portal)checked 10 Nov 2026
- Law No. (3) of 2015 Concerning the Regulation of the Real Estate Sector in the Emirate of Abu Dhabi (PDF, ADREC; compilation 'Real Estate Legislations', Department of Urban Planning and Municipalities)checked 10 Nov 2026
- Executive Council Resolution No. (6) of 2010 Approving the Implementing Bylaw of Law No. (13) of 2008 Regulating the Interim Real Property Register in the Emirate of Dubai (Dubai Legislation Portal)checked 10 Nov 2026
- Law No. (13) of 2008 Regulating the Interim Property Register in the Emirate of Dubai (Dubai Legislation Portal)checked 10 Nov 2026
- Market in Minutes, Dubai Residential Market, Q3 2026 (Savills Research)checked 17 Nov 2026
- Law of Georgia On the Protection of Consumer Rights, Legislative Herald of Georgiachecked 18 Nov 2026
- საჯარო რეესტრის შესახებ საქართველოს კანონი (Matsne, consolidated 01/04/2026)checked 18 Nov 2026
- IMF Country Report No. 26/133, Georgia: 2026 Article IV Consultation, Staff Reportchecked 18 Nov 2026
- SOVA, Who Can Afford Real Estate in Tbilisi: Mortgages, Installment Plans, and New Regulationschecked 18 Nov 2026
- Lex.bg: Закон за устройство на територията, посл. доп. ДВ бр. 99 от 30.10.2026checked 10 Nov 2026
- Lex.bg: Закон за задълженията и договорите, посл. изм. ДВ бр. 35 от 27.04.2021checked 10 Nov 2026
- Министерство на икономиката и индустрията: Regulations, related to commissioning (Act 15, 16)checked 18 Nov 2026
- Ley 38/1999, de 5 de noviembre, de Ordenación de la Edificación (texto consolidado)checked 10 Nov 2026
- AEDAS Homes, Cómo se paga un piso de obra nuevachecked 18 Nov 2026
- Luật Kinh doanh bất động sản số 29/2023/QH15 (Công báo số 43 + 44 ngày 08-01-2024)checked 18 Nov 2026
- Danh sách 39 dự án Luật thông qua tại Kỳ họp thứ 2, Quốc hội khóa XVI, dự kiến (LuatVietnam)checked 18 Nov 2026
- พระราชบัญญัติการดูแลผลประโยชน์ของคู่สัญญา พ.ศ. ๒๕๕๑ (Escrow Act B.E. 2551), Royal Gazette vol. 125 part 36 Kor, 20.02.2008, copy on the Fiscal Policy Office websitechecked 18 Nov 2026
- พระราชบัญญัติอาคารชุด พ.ศ. ๒๕๒๒checked 10 Nov 2026
- ประกาศคณะกรรมการว่าด้วยสัญญา เรื่อง ให้ธุรกิจการขายห้องชุดที่มีการจองเป็นธุรกิจที่ควบคุมสัญญา พ.ศ. ๒๕๖๗ (Royal Gazette vol. 141, special part 275 ง, 03.10.2567)checked 10 Nov 2026
- Thailand Specifies Form of Reservation Contract for Sale of Condo Units, Tilleke & Gibbinschecked 18 Nov 2026
- Tüketicinin Korunması Hakkında Kanun (Kanun No: 6502), Mevzuat Bilgi Sistemichecked 18 Nov 2026
- Ön Ödemeli Konut Satışları Hakkında Yönetmelik, Gümrük ve Ticaret Bakanlığı, Resmî Gazetechecked 18 Nov 2026
- Dubai Land Department, Escrow Account activationchecked 10 Nov 2026
- Real Estate Financing in Turkey, Tekcechecked 18 Nov 2026
- CONTRACT OF SALE, DLS Portalchecked 10 Nov 2026
- Regulations (Abu Dhabi Real Estate Centre)checked 10 Nov 2026
- Amendment to the Sale of Property (Specific Performance) Law, DLS Portalchecked 10 Nov 2026
- საჯარო რეესტრის ეროვნული სააგენტო: უძრავი ქონების რეგისტრაცია (საფასური და ვადები)checked 10 Nov 2026
- საქართველოს მთავრობის დადგენილება №93 (10.03.2023) №509 დადგენილებაში ცვლილების შეტანის შესახებ (Matsne)checked 10 Nov 2026
- Investor's Guide 2024, Sansirichecked 18 Nov 2026
- National Bank of Georgia, official exchange rates (JSON service of nbg.gov.ge), USD, 10.11.2026checked 10 Nov 2026